The countryside is open
Protected in name only

Summary
Malta's "Outside Development Zone" (ODZ) designation is meant to protect countryside, agricultural land, and environmentally sensitive areas from development. But ODZ approval rates have risen from 67.7% in 2001 to 85.0% in 2023 — an 18-point climb that has effectively opened the countryside to development. In total, 19,707 of 32,166 ODZ applications (61.3% of all filed; 68.7% of decided cases) have been approved, while 2,668 (8.3%) were refused. When the case officer recommends refusal and the case is heard at the ODZ commission, the board overrides that professional judgment about two-thirds of the time (64.2%). The system has 68 localities, and in the most permissive ones, ODZ approval rates exceed 90%. The gap between the most and least permissive localities for ODZ development is 28 percentage points.
2025 omitted: a large share of cases filed in 2025 have not yet been decided, and refusals are typically decided faster than approvals, so the decided-only sample understates the eventual rate.
Key findings
ODZ approvals have surged over two decades
| Year | ODZ applications | Approval rate |
|---|---|---|
| 2001 | 1,089 | 67.7% |
| 2005 | 1,332 | 74.0% |
| 2010 | 944 | 66.3% |
| 2015 | 874 | 75.6% |
| 2018 | 1,359 | 84.4% |
| 2020 | 1,678 | 83.6% |
| 2023 | 1,310 | 85.0% |
The tightening visible in 2007–2010 (dipping to 62–66%) was reversed decisively from 2013 onwards. By the late 2010s, ODZ approval rates exceeded those of some in-zone localities.
Zone designation barely matters anymore
| Zone | Applications | Approval rate | Refusal rate |
|---|---|---|---|
| Within Development Zone | 169,385 | 89.4% | 3.7% |
| Outside Development Zone | 31,974 | 73.2% | 8.3% |
| Not applicable | 31,233 | 83.5% | 9.3% |
The 16-point gap between in-zone and ODZ approval rates sounds significant. But an ODZ approval rate of 73.2% means nearly three in four applications to build in supposedly protected areas succeed. At the 2023 rate of 85%, the distinction is nearly meaningless.
The geography of ODZ permissiveness
ODZ approval rates vary dramatically by locality:
Most permissive ODZ localities (min 20 cases):
| Locality | ODZ cases | Approval rate |
|---|---|---|
| Floriana | 25 | 92.0% |
| Isla | 23 | 91.3% |
| Gzira | 38 | 86.8% |
| Luqa | 868 | 81.7% |
| Kerċem | 537 | 80.3% |
| Pembroke | 71 | 80.3% |
| Sannat | 348 | 79.6% |
Most restrictive ODZ localities (min 20 cases):
| Locality | ODZ cases | Approval rate |
|---|---|---|
| Għaxaq | 531 | 64.0% |
| Iklin | 266 | 66.9% |
| Fontana | 98 | 67.3% |
| Għargħur | 635 | 68.0% |
| Xgħajra | 177 | 68.4% |
| Dingli | 1,057 | 69.4% |
| Rabat | 3,058 | 71.2% |
The 28-point spread between the most and least permissive ODZ localities (92.0% vs 64.0%) suggests that ODZ protection is applied unevenly across the island.
Overall locality approval rates: a 16-point spread
Beyond ODZ, the overall locality approval rates also vary substantially:
| Locality | Total cases | Approval rate | Refusal rate |
|---|---|---|---|
| Fontana (highest) | 877 | 82.2% | 2.4% |
| San Pawl il-Baħar | 15,164 | 79.1% | 3.8% |
| Floriana (lowest, 200+ cases) | 1,745 | 65.7% | 7.3% |
| Pembroke | 1,396 | 68.5% | 4.2% |
| Sliema | 10,794 | 71.2% | 4.4% |
Fontana approves 82.2% of applications; Floriana approves 65.7%. If you're a developer, where you file matters.
How the override happens: officer refusals get reversed at the board
When the case officer's recommendedDecision is Refuse Permission and the case is then heard at a board commission, here is what happens. Override rate = unique cases where the board approved despite the officer's refusal recommendation, divided by unique cases the officer recommended for refusal that the commission heard.
| Commission | Cases (officer recommended refuse) | Board approved | Override rate |
|---|---|---|---|
| WDS (Within Development Scheme) | 4,891 | 3,400 | 69.5% |
| ODZ (Outside Development Zone) | 1,804 | 1,158 | 64.2% |
| BOARD (full Planning Board) | 82 | 35 | 42.7% |
The ODZ commission overrides the professional recommendation to refuse in about two-thirds of cases. This is on land explicitly designated as outside the development zone — where the presumption should be against development. In absolute terms, 1,158 developments were approved in ODZ areas despite the case officer recommending refusal. The WDS commission overrides at a slightly higher 69.5% rate, but on three times the volume.
Sanctioning applications (already-built developments seeking retroactive approval) show a high override-to-approve share too:
| Application type | Unique cases heard at board | Officer refused → board approved | Share of all heard |
|---|---|---|---|
| Sanctioning | 23,005 | 4,718 | 20.5% |
| Regular | 33,018 | 7,824 | 23.7% |
Across both categories, 12,542 cases went through the board after the case officer recommended refusal, and the board approved them anyway.
Notable cases
PA/00103/15 — Triq Il-Harrub, Madliena, Swieqi. A villa was "completely built without permits in ODZ," according to the NHAC panel, which strongly objected to its sanctioning. The board approved it anyway. This case distils the entire ODZ problem into a single application: build first, apply later, get approved despite expert objection — all on land explicitly designated as outside the development zone.
PA/03507/23 — Triq il-Pont, Swieqi. A "proposed farmhouse with pool including sanctioning of existing structures and demolition of original building" was approved in February 2026. The description reveals the pattern: what was once agricultural land with a traditional building becomes a luxury residence with a pool. The original building is demolished; the "farmhouse" label is retained as a planning fiction that enables ODZ approval.
PA/02136/24 — Triq Mongur, Għarb, Gozo. An existing disused farmhouse and cattle farm was approved for conversion to a Class 3A guesthouse with dining hall, basement parking, receded roof floor, and swimming pool. Approved in May 2025 (subsequently appealed to the Appeals Board / EPRT). The conversion of working agricultural buildings into tourism accommodation with pools and parking represents ODZ land being repurposed for commercial use under the cover of "rehabilitation."
Why this matters
The ODZ boundary is Malta's primary tool for containing urban sprawl on an island of 316 km². A system that approves 61% of all ODZ applications — rising to 85% by 2023 — is not containing anything; it is processing the paperwork for the countryside's conversion into building land. The steady upward trend in ODZ approval rates, from 68% to 85% over two decades, suggests a structural weakening of the boundary rather than case-by-case assessment.
International context
England's Green Belt serves a similar function to Malta's ODZ — protecting countryside from urban sprawl. Approval rates for "inappropriate development" on Green Belt land run at roughly 20%, and the national planning framework creates a strong presumption against such development. Malta's ODZ approval rate of 85% in 2023 is more than four times the English Green Belt rate. The comparison is not perfect — Green Belt rules are stricter by design — but it illustrates how far Malta's countryside protection has drifted from international norms. A boundary that approves 85% of applications is not a boundary; it is a processing queue.
The override data reveals the mechanism: when case officers recommend refusal on ODZ land and the case reaches the board, they are overturned about two-thirds of the time. This is not sporadic; it is systematic. The geographic variation adds another layer: the same ODZ designation offers meaningfully different protection depending on which locality you're in, suggesting that local political dynamics influence planning outcomes even in areas meant to be protected by national policy.
Each layer of oversight is being routinely circumvented in the same direction: toward approval. The officer's professional assessment says no; the board says yes. The result is countryside that is no longer countryside on paper. The "farmhouse with pool" pattern — visible across dozens of recent approvals — has become the vehicle for converting agricultural land into luxury residential and tourism property. If the current trajectory holds, the distinction between ODZ and development zone will become purely administrative within the next decade.
This finding also connects to the expert override pattern ("Overriding the experts"): when NHAC objected to ODZ developments on ecological grounds, the board overrode them 59% of the time. The system's multiple safeguards — zoning, officer assessment, expert panels — all point in the same direction, and all are routinely overridden. The question is no longer whether the ODZ boundary is effective, but whether it exists in any meaningful sense at all.
Media sources
- "ODZ permits already up by 74% over last year" — MaltaToday, 12 April 2017. Confirms the ODZ approval surge: 269 permits granted in Q1 2017 vs 154 in Q1 2016, with the approval rate jumping from 48.1% to 62.7%, corroborating the post-2013 permissive trend documented here.
- "When ODZ is not ODZ: How a new planning policy will change the Maltese countryside" — MaltaToday, 3 October 2014. Documents the 2014 rural policy that expanded permissible ODZ developments to include retail, tourism, and zoos in countryside buffer zones — the policy framework that enabled the approval rate climb from 68% to 85%.
- "TMID Editorial: The continued take-up of ODZ land" — The Malta Independent, 1 April 2024. Editorial warning that continued ODZ exceptions threaten Malta's remaining green spaces, arguing "if the authorities continue to make exceptions, then how much longer will that area remain green?" — echoing this discovery's conclusion that the ODZ boundary is becoming purely administrative.
- "When ODZ is not strictly ODZ" — Times of Malta, 17 July 2020. Editorial describing ODZ policy as "ineffective and open to abuse by both planners and government ministers," with architects and lawyers finding ways to circumvent protections -- corroborating the finding that ODZ designation barely matters anymore.
- "DLH warns of relentless destruction of ODZ land at Ta' Ċenċ" — Times of Malta, 3 February 2016. Heritage NGO Din l-Art Helwa warned against a proposal to build 15 villas on ODZ land at Ta' Ċenċ, Gozo, noting the Rural Policy did not contemplate new residences outside development zones -- corroborating the gap between policy and practice.